Purchased component
Lead Wires & Connectors
Cut, strip & crimp → Crimp verification → Housing insertion & continuity test
✓ Expert reviewed All content on this page has been reviewed by a senior motor engineer.
Process flow
3 main process steps, with the equipment and instruments used at each step, their main suppliers, and the technical control points.
- 1
Cut, strip & crimp
Wires are cut and stripped, and terminals crimped automatically.
⚙ Automatic Cut-Strip-Crimp MachineAutomated- International
- KomaxGuangzhou, SchleunigerShenzhen
- Mainland China
- To be added
Technical control points:
- ▪Strip length — Per terminal spec, typically ±0.5 mm; no nicked strandsCheck: Gauge; first piece and each reel
- ▪Crimp height and width — Terminal maker's value, typically ±0.03–0.05 mmCheck: Crimp-force monitor 100%; micrometer at setup and each reel
- 2
Crimp verification
Cross-sections and pull tests verify each setup and lot.
⚙ Crimp Cross-section Analyser & Pull TesterTest instrumentSemi-automaticManual- International
- To be added
- Mainland China
- To be added
Technical control points:
- ▪Crimp cross-section — Symmetric, no voids, all strands captured, bell-mouth presentCheck: Cross-section analyser; each setup and shift
- ▪Pull-out force — ≥ IEC 60352-2 value for the wire sizeCheck: Pull tester; each setup and shift
- 3
Housing insertion & continuity test
Terminals are inserted into connector housings and the harness is continuity-tested.
Technical control points:
- ▪Pin position — Matches wiring diagramCheck: Continuity tester; 100%
- ▪Terminal latching — Fully seated; withstands push-back testCheck: Push-back / pull check; 100%
- ▪Opens and shorts — NoneCheck: Continuity tester; 100%
Incoming inspection & approval tests
- Wire voltage and temperature ratingUL 758 (AWM)
- Terminal pull-out forceIEC 60352-2 / customer standard
- Mating force and mating cyclesConnector datasheet
- Flex lifeAgreed per application
Buyer FAQ
- Which lead wire should I use?
- UL 1007 / 1569 PVC wire for 80–105 °C and 300 V; UL 3266 or 3321 cross-linked wire for higher temperature; silicone or PTFE for the hottest applications. Match the wire's temperature and voltage rating to the motor's insulation class.
- What matters at the crimped terminal?
- Correct terminal and wire size, crimp height within the terminal maker's window, and pull-out force tests. Crimp-force monitoring on every crimp catches missing strands and bad crimps.
- How do I protect leads where they leave the motor?
- Use a grommet, strain relief or cable gland so the wire is not cut by sharp edges or pulled off the winding; vibration and pulling at the exit are a common field failure.